The Electric Corporation Power Plant is located in Arroyo, in the Santo Domingo district of southeastern Night City.
Overview[]
This old power plant was formerly owned by the International Electric Corporation, but was abandoned under mysterious circumstances at some point.[1]
In 2077, the Scavengers use it as a base of operations for their illegal braindance (XBD) activities.
Layout[]
Ground Floor[]
The ground floor consist of the main building, a large warehouse surrounded by walls.
Floor -1 (Sector 1)[]
Floor -2 (Sector 2)[]
Floor -3 (Sector 3)[]
Database Entry[]
OLD POWER PLANT
Formerly owned by Electric Corporation (yes, that's a real company) in Charter Hill[sic] and abandoned in mysterious circumstances, leaving the surrounding empty buildings unattended. But nothing in cities is truly empty, especially in a metropolis like Night City. The power plant was quickly overrun by gangs that need a lot of space, solid walls and thick doors to make sure that whatever they're doing doesn't catch the attention of any passersby.[1]
Associated Quests[]
Associated Shards[]
Notes[]
- The Justice Tarot Card can be found opposite of the building, on a large storage tank.
Bugs[]
- The database entry image displays the Satwave Power Plant. It also states to be in Charter Hill while it's in Arroyo. This is also incorrectly mentioned by Judy Álvarez during Disasterpiece.
- The database entry is not unlocked until the raid on the Satwave Power Plant during Lightning Breaks.
References[]
- ↑ 1.0 1.1 CD Projekt RED. Cyberpunk 2077. Video Game, Multi-Platform. Poland, CD Projekt S.A., 2020.